GAS FIELD DEVELOPMENT PROJECT HAZOP STUDY FOR NW WELLHEAD PLATFORM气田开发项目 NW井口平台HAZOP研究

927人参与 |分类: 现状评价|时间: 2022年01月06日

1.1       Scope of Work

 

The scope of the HAZOP study was the X-2 NW Wellhead Platform process facilities and associated utilities as detailed on the P&IDs, which comprised of:

  

·         DWG–NW–PR–1001 : P&ID for wellheads;

·         DWG–NW–PR–1201 : P&ID for multiple select valves;

·         DWG–NW–PR–1301 : P&ID for multi-phase flow meter;

·         DWG–NW–PR–1501 : P&ID for pig valve (launcher);

·         DWG–NW–PR–2501 : P&ID for production electric heater system;

·         DWG–NW–PR–3601 : P&ID for glycol injection facilities;

·         DWG–NW–PR–3602 : P&ID for corrosion inhibitor injection;

·         DWG–NW–SA–6001 : P&ID for fire water system;

·         DWG–NW–SA–6201 : P&ID for CO2 extinguishing system; and

·         DWG–NW–PR–6601 : P&ID for vent and closed drain system.

 

The above-mentioned P&IDs are attached in Appendix II.

2.2工作范围




HAZOP研究的范围是P&ID中详述的X-2 NW井口平台工艺设施和相关公用设施,包括:




•图纸NW-PR-1001:井口P&ID;


•图纸-NW-PR-1201:多个选定阀门的P&ID;


•图纸–NW–PR–1301:多相流量计的P&ID;


•图纸-NW-PR-1501:清管阀(发射器)的P&ID;


•图纸-NW-PR-2501:生产电加热器系统的P&ID;


•图纸NW-PR-3601:乙二醇注入设施的P&ID;


•图纸-NW-PR-3602:缓蚀剂注入的P&ID;


•图纸NW-SA-6001:消防水系统的P&ID;


•图纸-NW-SA-6201:CO2灭火系统的P&ID;和


•图纸–NW–PR–6601:通风和闭式排水系统的P&ID。




上述P&ID见附录II。


大小 : 19 |  下载量 : 1  |  文件类型 : 压缩文件