1.1 Scope of Work
The scope of the HAZOP study was the X 30-1 DPP Platform process facilities and associated utilities as detailed on the P&IDs, which comprised of:
· DWG–DPP–PR–111–101 : P&ID for DPP wellheads;
· DWG–DPP–PR–112–101 : P&ID for DPP production heads and test header;
· DWG–DPP–PR–113–101 : P&ID for DPP test separator;
· DWG–DPP–PR–114–101 : P&ID for DPP prodcution separator;
· DWG–DPP–PR–114–102 : P&ID for DPP gas coolers;
· DWG–DPP–PR–115–101 : P&ID for DPP export gas pig launcher;
· DWG–DPP–PR–221–111 : P&ID for DPP wet gas compression – inlet gas scrubber and gas compressor (train A) (future);
· DWG–DPP–PR–221–112 : P&ID for DPP wet gas compression after cooler and discharge gas scrubber (train A) (future);
· DWG–DPP–PR–221–121 : P&ID for DPP wet gas compression – inlet gas scrubber and gas compressor (train B) (future);
· DWG–DPP–PR–221–122 : P&ID for DPP wet gas compression after cooler and discharge gas scrubber (train B) (future);
· DWG–DPP–PR–221–211 : P&ID for DPP TEG dehydration system – filter separation (train A);
· DWG–DPP–PR–221–212 : P&ID for DPP TEG dehydration system – glycol contactor and lean TEG/dry gas heat exchanger (train A);
· DWG–DPP–PR–221–221 : P&ID for DPP TEG dehydration system – filter separation (train B);
· DWG–DPP–PR–221–222 : P&ID for DPP TEG dehydration system – glycol contactor and lean TEG/dry gas heat exchanger (train B);
· DWG–DPP–PR–222–111 : P&ID for DPP TEG regeneration – TEG flash drum and filter (train A);
· DWG–DPP–PR–222–113 : P&ID for DPP TEG regeneration – TEG regenerator and TEG still column (train A);
· DWG–DPP–PR–222–114 : P&ID for DPP TEG regeneration – TEG circulation pumps and lean/rich gas heat exchanger (train A);
· DWG–DPP–PR–223–101 : P&ID for DPP condensate dehydration – condensate coolers and filters;
· DWG–DPP–PR–223–102 : P&ID for DPP condensate dehydration – condensate coalescer A and condensate export pumps;
· DWG–DPP–PR–223–103 : P&ID for DPP condensate dehydration – condensate coalescer B;
· DWG–DPP–PR–224–101 : P&ID for DPP oily water treatment – hydrocyclones;
· DWG–DPP–PR–224–102 : P&ID for DPP oily water treatment – oil skim drum;
· DWG–DPP–PR–331–101 : P&ID for DPP fuel gas system – fuel gas scrubber;
· DWG–DPP–PR–331–103 : P&ID for DPP fuel gas system – fuel gas superheaters;
· DWG–DPP–PR–332–101 : P&ID for DPP diesel system – diesel storage and distribution;
· DWG–DPP–PR–332–102 : P&ID for DPP diesel system – diesel storage and distribution;
· DWG–DPP–PR–333–101 : P&ID for DPP HP flare knock-out drum;
· DWG–DPP–PR–333–102 : P&ID for DPP HP and LP flare TIP facilities;
· DWG–DPP–PR–333–901 : P&ID for DPP HP/LP flare collection headers;
· DWG–DPP–PR–441–101 : P&ID for DPP seawater system – seawater lifting pumps and auto backwash coarse filter;
· DWG–DPP–PR–441–102 : P&ID for DPP seawater system – seawater distribution;
· DWG–DPP–PR–445–101 : P&ID for DPP closed drain system – closed drain drum and pumps;
· DWG–DPP–PR–445–102 : P&ID for DPP open drain – tank and recovery pump;
· DWG–DPP–PR–445–901 : P&ID for DPP closed drain system – collection headers;
· DWG–DPP–PR–771–101 : P&ID for DPP fuel/utilities for gas turbine generator;
· DWG–DPP–PR–771–102 : P&ID for DPP fuel gas receiver;
· DWG–DPP–PR–772–101 : P&ID for DPP diesel system – diesel day tank and emergency power generator;
· DWG–DPP–PR–661–003 : P&ID for fire water pump (DPP–P–6101);
· DWG–DPP–PR–661–004 : P&ID for fire water pump (DPP–P–6102); and
· DWG–DPP–PR–661–005 : P&ID for fire water ringmain.
The above-mentioned P&IDs are attached in Appendix II.
2.2工作范围
HAZOP研究的范围是P&ID中详述的X 30-1 DPP平台工艺设施和相关公用设施,包括:
•图纸–DPP–PR–111–101:DPP井口的P&ID;
•图纸–DPP–PR–112–101:DPP生产封头和试验封头的P&ID;
•图纸–DPP–PR–113–101:DPP试验分离器的P&ID;
•图纸–DPP–PR–114–101:DPP生产分离器的P&ID;
•图纸–DPP–PR–114–102:DPP气体冷却器的P&ID;
•图纸–DPP–PR–115–101:DPP出口气体清管器发射器的P&ID;
•图纸–DPP–PR–221–111:DPP湿气压缩–入口气体洗涤器和气体压缩机(A列)的P&ID(未来);
•图纸–DPP–PR–221–112:DPP湿气压缩后冷却器和排放气体洗涤器(A列)的P&ID(未来);
•图纸–DPP–PR–221–121:DPP湿气压缩–入口气体洗涤器和气体压缩机(B列)的P&ID(未来);
•图纸–DPP–PR–221–122:DPP湿气压缩后冷却器和排放气体洗涤器(B列)的P&ID(未来);
•图纸–DPP–PR–221–211:DPP TEG脱水系统的P&ID–过滤器分离(A列);
•图纸–DPP–PR–221–212:DPP TEG脱水系统的P&ID–乙二醇接触器和贫TEG/干气热交换器(A列);
•图纸–DPP–PR–221–221:DPP TEG脱水系统的P&ID–过滤器分离(B列);
•图纸–DPP–PR–221–222:DPP TEG脱水系统的P&ID–乙二醇接触器和贫TEG/干气热交换器(B列);
•图纸–DPP–PR–222–111:DPP TEG再生的P&ID–TEG闪蒸罐和过滤器(A列);
•图纸–DPP–PR–222–113:DPP TEG再生–TEG再生器和TEG蒸馏塔(A列)的P&ID;
•图纸–DPP–PR–222–114:DPP TEG再生的P&ID–TEG循环泵和贫/富气热交换器(A列);
•图纸–DPP–PR–223–101:DPP冷凝水脱水–冷凝水冷却器和过滤器的P&ID;
•图纸–DPP–PR–223–102:DPP冷凝水脱水–冷凝水聚结器A和冷凝水出口泵的P&ID;
•图纸–DPP–PR–223–103:DPP冷凝水脱水–冷凝水聚结器B的P&ID;
•图纸–DPP–PR–224–101:DPP含油污水处理–水力旋流器的P&ID;
•图纸–DPP–PR–224–102:DPP含油水处理–撇油桶的P&ID;
•图纸–DPP–PR–331–101:DPP燃气系统–燃气洗涤器的P&ID;
•图纸–DPP–PR–331–103:DPP燃气系统–燃气过热器的P&ID;
•图纸–DPP–PR–332–101:DPP柴油系统的P&ID–柴油储存和分配;
•图纸–DPP–PR–332–102:DPP柴油系统的P&ID–柴油储存和分配;
•图纸–DPP–PR–333–101:DPP高压火炬分液罐的P&ID;
•图纸–DPP–PR–333–102:DPP高压和低压火炬头设施的P&ID;
•图纸–DPP–PR–333–901:DPP高压/低压火炬收集集管的P&ID;
•图纸–DPP–PR–441–101:DPP海水系统的P&ID–海水提升泵和自动反洗粗滤器;
•图纸–DPP–PR–441–102:DPP海水系统的P&ID–海水分配;
•图纸–DPP–PR–445–101:DPP闭式排水系统的P&ID–闭式排水桶和泵;
•图纸–DPP–PR–445–102:DPP明渠–储罐和回收泵的P&ID;
•图纸–DPP–PR–445–901:DPP闭式排水系统–收集集管的P&ID;
•图纸–DPP–PR–771–101:燃气轮机发电机DPP燃料/公用设施的P&ID;
•图纸–DPP–PR–771–102:DPP燃气接收器的P&ID;
•图纸–DPP–PR–772–101:DPP柴油系统–柴油日计量箱和应急发电机的P&ID;
•图纸–DPP–PR–661–003:消防水泵的P&ID(DPP–P–6101);
•图纸–DPP–PR–661–004:消防水泵的P&ID(DPP–P–6102);和
•图纸–DPP–PR–661–005:消防水环管的P&ID。
上述P&ID见附录II。
大小 : 25 | 下载量 : 5 | 文件类型 : 压缩文件
30-1 GAS FIELD DEVELOPMENT PROJECT HAZOP STUDY FOR 30-1 DPP PLATFORM气田开发项目30-1 DPP平台HAZOP研究
955人参与 |分类: 现状评价|时间: 2022年01月06日
来源:安全评价网会员转载请保留出处和链接!
相关文件
- 2022-01-10HAZOP STUDY FOR THE BASIC DESIGN OF FPSO浮式生产储油船基础设计HAZOP研究
- 2022-01-10OIL & GAS FIELD COMPANY HAZOP STUDY油气田分公司 危险与可操作性研究
- 2022-01-10HAZOP STUDY FOR 13-1/2 OIL FIELD FPSO HC RECOVERY13-1/2油田FPSO HC回收HAZOP研究
- 2022-01-10GAS FIELD DEVELOPMENT PROJECT HAZOP STUDY FOR PLATFORM气田平台开发项目危险与可操作性研究
- 2022-01-10HAZOP STUDY FOR BASIC DESIGN OF OFFSHORE OIL FIELD DEVELOPMENT 海上油田开发基础设计HAZOP研究
- 2022-01-07HAZOP STUDY FOR XGAS STORAGE FACILITY
- 2022-01-07HAZOP STUDY FOR X LNG RECEIVING TERMINAL PROJECT
- 2022-01-06HAZOP STUDY FOR THE BASIC DESIGN OF FPSOFPSO基础设计HAZOP研究
- 2022-01-06HAZOP STUDY FOR BASIC DESIGN OF XJ 23-1 MODURAL DRILLING RIG XJ 23-1型钻机基础设计HAZOP研究
- 2022-01-06GAS DEVELOPMENT PROJECT HAZOP STUDY FOR X GAS TERMINAL天然气开发项目 天然气接收站HAZOP研究
评论专区杜绝广告与政治言论、违者封号